Verified Field Case StudyPlumbing

Plumbing Work

Concealed pipeline pressure testing, CPVC pipeline redesign, and zero-breakage leak isolation.

Ajmer, Rajasthan
June 2026
3 Floors
Plumbing Work
Verified Execution
Execution Profile

Project Information & Parameters

Client / Property Type

Hospital Complex

Specialization

Plumbing

Project Location

Ajmer, Rajasthan

Area Treated

3 Floors

Execution Duration

5 Days

Completion Date

June 2026

Project Status

Successfully Completed & Warranty Active

Case Study Overview

Project Overview

Concealed pipeline pressure testing, CPVC pipeline redesign, and zero-breakage leak isolation.

Initial Site Diagnostics

The Problem & Structural Challenges

Concealed shaft riser corrosion and pressure fluctuations resulting in intermittent structural dampness in multi-storey hospital facility.
Engineering Deliverables

Scope of Work Executed

  • Acoustic electronic leak detection across vertical shafts
  • Hydrostatic pneumatic pressure testing
  • Replacement of corroded GI risers with SDR-11 chlorinated polyvinyl chloride (CPVC)
  • Vibration-damped acoustic pipe clamps & thermal expansion loops
  • Full shaft fire-stop barrier sealing and civil reinstatement
Technical Remediation

Engineered Solution & Methodology

Engineered turnkey pipe redesign utilizing high-grade CPVC and industrial copper manifold distribution. Zero-breakage diagnostic isolation prevented disruption to operational wards.
Outcome & Handover

Results & Warranty Documentation

Normalized system operating pressure to 4.2 bar with zero leakage. Shaft moisture dropped to ambient levels within 72 hours.
Building Skyline

Need Professional Building Services?

Let's take care of your property. Fast doorstep site inspection across Bhilwara & Rajasthan.