Verified Field Case StudyFeatured ExecutionWaterproofing

Terrace Waterproofing

Permanent positive-side waterproofing with elastomeric PU membrane and 48-hour ponding test.

Udaipur, Rajasthan
August 2026
4,200 sq.ft
Terrace Waterproofing
Verified Execution
Execution Profile

Project Information & Parameters

Client / Property Type

Residential Villa

Specialization

Waterproofing

Project Location

Udaipur, Rajasthan

Area Treated

4,200 sq.ft

Execution Duration

6 Days

Completion Date

August 2026

Project Status

Successfully Completed & Warranty Active

Case Study Overview

Project Overview

Permanent positive-side waterproofing with elastomeric PU membrane and 48-hour ponding test.

Initial Site Diagnostics

The Problem & Structural Challenges

Persistent monsoon water seepage through parapet joints and hairline concrete shrinkage cracks resulting in severe ceiling dampness in upper-floor residential suites.
Engineering Deliverables

Scope of Work Executed

  • Surface grinding & high-pressure cleaning
  • V-groove chase cutting along thermal cracks
  • Polymer modified mortar (PMM) levelling
  • Dual-coat aliphatic polyurethane elastomeric membrane application
  • Non-woven geotextile scrim reinforcement
  • 48-hour continuous flood ponding test
Technical Remediation

Engineered Solution & Methodology

Executed systematic positive-side waterproofing system using elastomeric PU waterproofing membrane with tensile reinforcement. Finished with protective UV-resistant topcoat and certified 7-year performance warranty.
Outcome & Handover

Results & Warranty Documentation

Complete elimination of dampness and seepage. Zero ponding water penetration verified across a strict 48-hour inspection audit. Full technical warranty certificate issued to property owner.
Building Skyline

Need Professional Building Services?

Let's take care of your property. Fast doorstep site inspection across Bhilwara & Rajasthan.